New Jersey Appeals Court Ruling Highlights High Stakes of Precision in Public Construction Bidding

A recent New Jersey appellate decision is sending a clear message to contractors and public agencies alike: strict adherence to bid requirements is not optional, and even seemingly minor technical missteps can cost companies major public contracts. The ruling, which arose from a school construction project in Edison Township, reinforces the authority of public entities to enforce detailed bidding specifications and underscores the growing importance of procedural accuracy in public procurement.

The dispute stemmed from bids submitted for an addition to a school overseen by the Edison Township Board of Education. Three construction firms were in contention, with two companies submitting lower-priced bids than the eventual contract winner. Despite the higher cost, the Board awarded the project to Vanas Construction Co., determining it was the lowest responsible bidder because its submission fully complied with all bid requirements.

The lower bids, submitted by ML, Inc. and Benard Associates, were rejected due to defects the Board classified as material and non-waivable. Both firms challenged the decision, arguing that the issues identified should not have disqualified their bids. The courts disagreed.

At the center of the case were timing and accuracy requirements tied to mandatory bid documents. ML’s submission included a required disclosure form detailing ongoing project obligations for its subcontractor. While the form itself was completed properly, it was dated several months before the bid opening. The Board concluded that the information was no longer “current” and therefore unreliable, a determination the courts found to be reasonable given the explicit language in the bid specifications.

Benard’s bid was rejected for a different but equally critical reason. Its bid bond was dated more than a month before the bid opening and prior to a significant project addendum that altered the scope and pricing of the work. The Board determined that the bond did not adequately protect the district, as the surety may not have agreed to cover the revised project terms. The appellate court upheld that reasoning, noting that bid bonds are fundamental to ensuring enforceability and financial security in public contracting.

The ruling reinforces a long-standing principle in New Jersey public procurement: public entities have broad discretion to draft bid requirements and enforce them as written, particularly when the defects affect the integrity of the bidding process. Courts are generally reluctant to override those decisions unless they are arbitrary or unreasonable, a threshold that was not met in this case.

For contractors, the implications are significant. Competitive pricing alone is no longer enough to secure public work. Every required document must be accurate, timely, and aligned precisely with bid instructions. Forms that are outdated, bonds that are improperly dated, or submissions that fail to account for late-stage addenda can all be grounds for rejection, even when the bid offers substantial cost savings.

Public boards and agencies, meanwhile, may view the decision as confirmation that detailed specifications matter and that enforcing them protects both taxpayers and project integrity. Clear bid language, consistent enforcement, and careful review of submissions remain essential components of responsible public contracting.

As technology continues to shape procurement systems, document management, and compliance tracking, cases like this highlight the intersection of legal standards and operational execution. Contractors increasingly rely on digital tools to manage complex bid requirements, while public entities use technology to standardize and scrutinize submissions. Readers interested in how technology intersects with legal, business, and infrastructure developments across the state can explore additional coverage in Explore New Jersey’s Real Estate & Construction section.

The Edison Township case serves as a cautionary tale for anyone involved in public bidding in New Jersey. In an environment where compliance is paramount, attention to detail is not just best practice—it is often the deciding factor between winning and losing a contract.